The Data Center Debate

Data and research

The numbers, tracked

Every figure that gets thrown around in this debate, with the document it came from, what it actually measures, and how it has moved. The daily update checks for new official releases and records changes below.

Electricity

192 TWh
US data center electricity use, 2024 (the last measured year)

About 4.7% of all US electricity

Lawrence Berkeley National Laboratory (source 1), as of June 2026

The official federal count, published June 2026. Both sides accept it. Excludes cryptocurrency mining. The next measured year (2025) will not be published until 2027.

About 234 TWh
2025 estimate (Berkeley Lab, same series as the 2024 figure)

The lab's Reference Case has use rising 22% from 2024 to 2025. Applied to 192 TWh that is roughly 234 TWh, or about 5.6% of US electricity

Lawrence Berkeley National Laboratory, 2025 Update (source 1), as of June 2026

An estimate, not a measurement. The report states the growth rate in its conclusion and shows the yearly values only in a chart, so the 234 figure is derived. Its own stress test puts the range at roughly 20% below to 30% above.

312.6 TWh
2025 estimate (Energy Institute Statistical Review, S&P Global Energy data)

Up 25.5% from 249.0 TWh in 2024. About 39.7% of a world total of 787.8 TWh; China 205.7 TWh, Europe 144.6 TWh

Energy Institute Statistical Review of World Energy 2026 (as reported by Forbes, August 23, 2026) (source 101), as of July 2026

A different scorekeeper with a broader count: it puts 2024 at 249 TWh where Berkeley Lab puts it at 192 TWh. Both are defensible; they define and model data centers differently. Never mix the two series in one sentence.

History (2 points)
  • 2025: 312.6 TWh
  • 2024: 249.0 TWh
485 TWh
World data center electricity use, 2025 (IEA)

Up more than 15% from about 415 TWh in 2024, roughly 1.5% of world electricity. AI-focused data centers grew about 50%. The IEA puts the US at about half of world capacity

IEA, Key Questions on Energy and AI (2026) (source 100), as of 2026

The IEA's world total (485 TWh) is far below the Energy Institute's (787.8 TWh) for the same year. Same lesson: check which series a number comes from before comparing.

History (2 points)
  • 2024: About 415 TWh
  • 2025: 485 TWh
About 302 TWh
2026 forecast (Berkeley Lab)

Reference Case growth of 29% from 2025 to 2026, applied to the 234 TWh 2025 estimate. Roughly 7% of US electricity

Lawrence Berkeley National Laboratory, 2025 Update (source 1), as of June 2026

A forecast. Nobody will have a measured 2026 national figure until 2028.

3.3%
2026 year to date: the closest measured number

EIA forecast growth in commercial sector electricity sales for 2026, driven by data centers and manufacturing; 2.7% forecast for 2027 (Short-Term Energy Outlook, Table 7a)

EIA September 2026 Short-Term Energy Outlook (source 102), as of September 9, 2026

Commercial sector includes offices, retail and other non-industrial business uses, not just data centers, so this is an upper bound for data center-driven growth.

History (2 points)
  • June 2026: +3.3% (738.7 vs 715.0 TWh, Jan to Jun)
  • September 9, 2026: 3.3%
649 TWh
Best estimate for 2030 (Berkeley Lab)

The report's four sensitivity scenarios span 578 to 782 TWh, which is 10.5% to 14.2% of US electricity. Its wider compounded uncertainty range is 521 to 843 TWh, or 9.5% to 15.3%

Lawrence Berkeley National Laboratory (source 1), as of June 2026

The authors publish ranges on purpose. 649 TWh is the Reference Case, not the midpoint of anything, and the two ranges are different things: do not pair the narrow band of TWh with the wide band of percentages, which is an easy mistake because both appear in the same report. Do not quote any single figure as a prediction.

12% a year
How fast world data center electricity use is growing

From 2017 to 2023, four times faster than global electricity growth overall

International Telecommunication Union and World Benchmarking Alliance (source 83), as of June 2025

From the United Nations' own digital agency, using figures the companies report themselves. This is a growth rate, not a total. It is the clearest single answer to why this argument arrived so suddenly: the curve is bending up much faster than electricity demand in general.

581 TWh
Electricity used by 164 large digital companies, 2023

About 2.1% of world electricity, and ten companies account for half of it

International Telecommunication Union and World Benchmarking Alliance (source 83), as of June 2025

Read the label carefully: this counts these companies' entire operations, not their data centers alone, so it is not a data center total and should never be quoted as one. It is useful for a different point, which is how few companies this power use sits with. The same report found 23 companies ran on 100% renewable electricity in 2023, up from 16 the year before.

945 TWh
World data center electricity use in 2030 (UN University projection)

A projection, starting from an estimated 448 TWh in 2025

United Nations University Institute for Water, Environment and Health (source 84), as of June 2026

A projection, not a measurement. Note the starting point before you use it: this report puts 2025 at 448 TWh, while the IEA figure on this page puts the same year at 485 TWh. Neither is wrong; they are different series. Check which one a number came from before setting two of them side by side.

Grid costs

$333.44 per MW-day
PJM capacity (standby) price

Up from $28.92 before the spike, then $269.92, then $329.17, then the price ceiling

Utility Dive (source 18), as of December 2025

Wholesale standby price, not a household bill. Standby is roughly a tenth to a quarter of a home bill.

History (3 points)
  • July 2024: $28.92 to $269.92
  • July 2025: $329.17
  • December 2025: $333.44 (ceiling)
$6.3 billion (38%)
Data center share of one PJM auction's cost

Of $16.4 billion in charges, per the independent market monitor

Monitoring Analytics via Utility Dive (source 17), as of 2026

Measures who caused the cost, not how the bill was split. Both sides accept the number.

32 GW
PJM peak demand growth expected by 2030

All but 2 GW attributed to data centers, in PJM's own load forecast

Utility Dive (source 104), as of December 2025

$20 to $28 a month
What the price spike did to a New Jersey home bill

The state board's own figure, a 17 to 20% jump in the supply portion, phased in from June 2025

New Jersey Board of Public Utilities (source 27), as of February 2025

New Jersey is the clearest case because its board published dollar figures; most states did not. PJM reports the capacity cost as a percentage of the bill, 1.5 to 5% in some states, and does not publish a dollar-per-household number, so do not expect the two to line up.

Policy

38
New special rate rules for giant customers, 2018 to 2026

30 of them created in 2025 and 2026

E3 (commissioned by the Data Center Coalition) (source 8), as of May 2026

Industry-funded study. Count is verifiable in state filings.

January 1, 2027
Virginia large-customer rules start

A new rate class for the largest customers: 14-year contracts and minimum charges covering the capacity they reserve, whether they use it or not

Virginia State Corporation Commission (source 9), as of February 2026

Read the 60% figure carefully if you meet it elsewhere: it is the share of those minimum charges a customer must guarantee with collateral, and only if its credit is not strong enough on its own. It is a credit requirement, not a block of generation set aside for data centers.

Taxes

48 cents
Virginia state revenue returned per exempted dollar, 2014 to 2023

Against 41 cents for the average Virginia incentive. The same table gives 84 jobs against 58, and $10 million of state GDP against $9 million, per $1 million spent

JLARC (Virginia legislature's nonpartisan auditor) (source 22), as of December 2024

JLARC rates the exemption 'moderate' and says it is similar to the average incentive, so it does beat the average but not dramatically. It still does not pay for itself on the state's own books: 48 cents back per dollar given up is a loss, just a smaller one than most.

$6.10
Labor income per exempted dollar (Virginia, 2026 evaluation)

Ranked the state's second-best incentive

Cardinal News (source 28), as of June 2026

Measures wages generated, largely during construction, not money back to the treasury.

$1.6 billion
Ohio data center exemption cost, 2025

Up from $555 million in 2024; that works out to roughly $330 per Ohio household

Good Jobs First (source 20), as of 2026

The per household figure is this site's own arithmetic, the state total divided by Ohio households, not a number Good Jobs First published. It is a way to feel the size of the total, not a bill anyone receives.

History (2 points)
  • 2024: $555 million
  • 2025: $1.6 billion
52 to 70 cents per dollar
States that measured their return lose

Fourteen states with exemptions publish no annual total at all

Good Jobs First (source 20), as of November 2025

Counts money given away; does not fully count money later collected.

$1.2 billion
Loudoun County data center property tax revenue, FY2026

About 39% of the county budget; tax rate cut every year from $1.145 (2016) to $0.805 (2026) per $100

Loudoun County, Virginia (source 4), as of February 2025

Public budget documents. The most favorable case in the country.

Jobs

100 to 200
Permanent jobs per county after a first major data center

Computing employment up 56%, telecom up 43%, wages flat, home values up 2 to 5% over a decade

Brookings (Bahar and Wright) (source 6), as of 2026

The one jobs study both sides cite.

5.5 million
Industry-modeled supported jobs, nationally

Each direct job modeled to support 4.5 more

PwC for the Data Center Coalition (source 31), as of 2025

Modeled, not measured; industry-funded.

28 million
IBEW Local 26 hours worked last year (DC, MD, VA)

At least half of them from data center work, according to the local

Boston Globe (source 7), as of May 2026

Reported by the local union rather than from an audited filing. The often repeated additions, that this is double the hours of a decade earlier and that the local took on 600 new apprentices in one year, are not in the article cited here, so they are left out until they can be sourced.

74,000 jobs
Data centers add to Virginia each year

$5.5 billion in wages, $9.1 billion to the state economy, mostly during initial construction

JLARC (source 22), as of December 2024

Both sides accept this line and the next: costs 'will likely increase' for all customers.

Water

About 5.4 million liters
Freshwater to train one AI model, all in (estimate)

The GPT-3 estimate: about 700,000 liters evaporated on site, and the rest consumed off site generating the electricity; global AI water use projected at 4.2 to 6.6 billion cubic meters by 2027

UC Riverside (Li, Yang, Islam, Ren) (source 23), as of 2025

The 700,000 litre figure travels much further than the full one, and it is the on-site share alone. Quote whichever you mean, but say which: they differ by roughly eight times. Both are modelled estimates for one 2022-era model, not a measurement, and newer chips change the arithmetic.

About 90%
Microsoft reported water reduction vs earliest facilities

Against its earliest facility designs, by the company's own accounting

GeekWire (source 14), as of 2026

Self reported by Microsoft and not independently audited, and it compares new designs against the company's oldest ones rather than against the industry. Claims that the newest designs use no water at all in normal operation, and that Google has committed to the same by 2030, are widely repeated but are not in this source; treat them as unverified here.

9.3 trillion liters
Water footprint of AI data centers in 2030 (UN University projection)

The report compares it to the basic yearly household water needs of 1.3 billion people

United Nations University Institute for Water, Environment and Health (source 84), as of June 2026

Projected, not measured, and global: it tells you nothing about any single site, which is the level where most water fights actually happen. The comparison to household needs across Sub-Saharan Africa is the report's own framing, and the institute's specialty is water.

Opposition

$64 billion
Projects blocked or delayed by local opposition, 2024 through early 2026

$18 billion blocked outright and $46 billion delayed, counted over about two years

Data Center Watch (source 25), as of 2025

Not a calendar-2025 total: the tracker's own window runs from 2024 into early 2026. Data Center Watch is run by 10a Labs, an AI security firm whose paying clients include AI companies. 10a Labs says the tracker itself is not client funded and is kept separate from that work, which is its position, not an audited fact.

History (2 points)
  • 2025: $64 billion
  • 2026-Q1: About $130 billion in one quarter (about 75 projects)
About $130 billion
Projects blocked or delayed, first quarter of 2026

About 75 projects; opposition groups more than doubled across 49 states; 14 legislatures took up pause bills

Data Center Watch (source 25), as of April 2026

Price tag of investment that did not land, not money anyone saved.

45 projects, about $68 billion
US data center projects blocked or delayed in Q2 2026

Data Center Watch counted 45 US data center projects blocked or delayed by local opposition between April and June 2026, with regulatory scrutiny in 49 states

Data Center Watch Q2 2026 report (source 103), as of September 21, 2026

Combines blocked and delayed projects, and rests on public records and press tracking rather than a regulator database. The project-level detail sits behind a paid report, so the free version cannot be checked line by line, and Data Center Watch does not fully disclose its funders.

~$130B
Data center projects canceled, Q3 2026

Heatmap Pro says data center investments totaling about $130 billion were canceled in the three months ending September 30, 2026, with roughly $260 billion canceled year to date and about $1 trillion facing meaningful opposition.

Heatmap News (Heatmap Pro), as of October 7, 2026

Measures announced dollar values of projects canceled or paused, not built capacity lost; based on Heatmap's proprietary tracker.

61%
Share of US voters who dislike officials supporting local data centers

8% like such officials; 75% of Democrats and 44% of Republicans dislike them, survey of US adults September 28 to October 4, 2026

Pew Research Center, as of October 8, 2026

Pew's question asks about a hypothetical local data center, not a specific project; it captures political sentiment, not a vote tally.

Buildout

$44.7 billion
Actual US data center construction spending, first quarter of 2026

Record quarter; full-year investment forecast near $700 billion

Industrial Info Resources (source 29), as of 2026

Commercial market data with no side in the debate.

43.6 GW vs 1.1 GW
AI data center capacity the index can identify, US against China

Across 84 tracked US facilities and 7 Chinese ones, as counted in 2026

AI Data Center Index (source 30), as of September 2026

Read this as a floor, not a world share. The tracker counts facilities it can identify from public announcements, and it sees far less of China than of the US, so part of the gap it shows is a gap in visibility rather than in concrete. It is evidence that the US is building more; it is not a measurement of who holds what share of world AI compute.

$98.5 billion
US data center construction spending, year to date through August 2026

Across 153 tracked projects; $14.4 billion added in August alone

ConstructConnect October 2026 Data Center Report, as of October 1, 2026

Counts tracked starts and announcements, not completed facilities, so the figure can include projects that are later canceled or delayed.

Grid

About 100 GW
New demand the existing grid could absorb if loads flex

Across regions serving about 95% of the country, if customers accept short, occasional cutbacks

Duke University Nicholas Institute (source 11), as of February 2025

Depends on flexibility that most contracts do not yet require.

9 sites
Live flexible-load test sites (EPRI DCFlex)

US and Europe; the launch named Compass Datacenters, Constellation, Emerald AI, Google, National Grid, Nebius, NVIDIA, Oracle and PADO AI

EPRI (source 12), as of 2026

Participants include the companies being tested, and the roster changes as the initiative adds members.

4,016.9 MW
PJM data center load canceled or delayed, 2026 to 2029

42 percent of forecast data center demand growth between the 2026 to 2027 and 2028 to 2029 delivery years, as of September 21, 2026

PJM Independent Market Monitor via Forbes, as of September 21, 2026

Measures announced data center load inside PJM that has been formally canceled or delayed, not total pipeline. The underlying forecast still rises overall, so the figure describes shrinkage of expected growth, not a shrinking grid load in absolute terms.

Change log

What the daily research update added or changed, newest first.

  • October 13, 2026 New tracked number: Share of US voters who dislike officials supporting local data centers = 61%.
  • October 13, 2026 Daily update: 12 news items, 3 reports, 2 new and 0 updated map projects, 1 number updates, 3 argument notes, 2 FAQ additions. The last 48 hours were dominated by county and city action against data centers, including Delaware's first municipal moratorium in Dover and a first-reading moratorium vote in Shelby County, Tennessee. On the policy side, FERC approved PJM's new data center registry effective October 12 while rejecting the rest of PJM's curtailment plan, Indiana regulators approved utility infrastructure for a Google data center that Google will pay for, and a Senate Democratic report on hyperscaler cost shifting and continued NDA use was released October 9. A Pew Research survey published October 8 found 61 percent of registered voters dislike officials who support local data centers.
  • October 12, 2026 New tracked number: PJM data center load canceled or delayed, 2026 to 2029 = 4,016.9 MW.
  • October 12, 2026 Daily update: 3 news items, 0 reports, 1 new and 0 updated map projects, 1 number updates, 2 argument notes, 2 FAQ additions. The main item is a Forbes writeup of PJM's independent market monitor finding that about 4,000 megawatts, or 42 percent, of forecast data center load for the 2026 to 2029 delivery years has already been delayed or canceled. Critics say that undercuts the forecasts driving new power plants and higher capacity prices, while the industry says even the reduced numbers still require a large build. Bloomberg on October 10 ran a broader analysis of how data center demand is lifting US electricity prices, and Indiana coverage the same week reports more than 18,000 skilled trades workers on data center projects in 2026, mostly in temporary construction roles.
  • October 11, 2026 Daily update: 10 news items, 2 reports, 3 new and 0 updated map projects, 0 number updates, 3 argument notes, 2 FAQ additions. The day leaned heavily toward items that strengthen the case against data centers. The U.S. Department of Energy made its first FERC filing in five years to press PJM to shield existing ratepayers from a 6.8 GW capacity backstop driven by data center demand, three Senate Democrats released a yearlong investigation accusing seven large tech companies of underpaying grid costs, and new local lawsuits were filed in Colorado and Maryland. For the industry, a $15 billion Hudspeth County, Texas project and a $66 billion Fremont County, Wyoming plan advanced in counties with little or no zoning authority, and a Loudoun County, Virginia motion to strip 15 data center approvals was tabled after a legal cost warning.
  • October 10, 2026 Daily update: 9 news items, 1 reports, 0 new and 0 updated map projects, 0 number updates, 3 argument notes, 2 FAQ additions. Investor appetite for AI data center valuations wobbled as Nvidia-backed Firmus withdrew what would have been a $5 billion Australian IPO, while new local and state actions moved forward in Kentucky, Indiana, Arizona, Utah and Illinois. On the for side, a Georgia Atlanta Journal-Constitution report documented tangible local gains from the construction boom, and prediction markets kept raising their odds that US data center counts will top 5,100 by 2027. A new Scioto Analysis cost-benefit study estimated that Ohio's current data center policy barely breaks even going forward and that a construction ban or a 90 percent clean-power requirement would score higher.
  • October 9, 2026 Map: Oakland Data Center Moratorium (CA) status changed to blocked. Source: The Oaklandside.
  • October 9, 2026 New tracked number: Data center projects canceled, Q3 2026 = ~$130B.
  • October 9, 2026 Daily update: 20 news items, 3 reports, 8 new and 1 updated map projects, 1 number updates, 3 argument notes, 2 FAQ additions. Today's roster leans heavily against: Oakland and Raleigh approved moratoriums, Mendocino County extended its ban to 2028, Wisconsin Republicans proposed repealing the state data center tax exemption, the Fed's September minutes blame the AI buildout for inflation, and a new Heatmap tally puts canceled projects at $260 billion for 2026. On the pro side, Stafford County, Virginia, Salisbury, North Carolina, Taylor, Texas, and Luzerne County, Pennsylvania moved rezonings or framework ordinances forward, Duke Energy filed a long awaited large load tariff settlement, and the White House announced a Southeast university AI computing consortium.
  • October 8, 2026 Daily update: 12 news items, 1 reports, 3 new and 0 updated map projects, 0 number updates, 2 argument notes, 2 FAQ additions. The news tilted mixed but moratorium-heavy. Raleigh, North Carolina and Anne Arundel County, Maryland approved new pauses, and Loudoun County, Virginia tabled a grandfathering rollback over a warned $60 million litigation risk. The industry got a win in Spartanburg, South Carolina where a judge dismissed a citizens' suit against the $2.8 billion Valara project, while Hallam, Nebraska approved a 35 MW Monolith and Crusoe campus and Brookwood, Alabama's council backed the $3.2 billion Delta Forge 2 project. A new Illinois Economic Policy Institute report put concrete numbers on a long-running jobs argument, projecting that $57 billion in planned Illinois data centers would create 121,000 jobs but only 2,800 permanent ones.
  • October 7, 2026 Daily update: 10 news items, 0 reports, 1 new and 1 updated map projects, 0 number updates, 2 argument notes, 2 FAQ additions. The biggest news in the last 48 hours is Google's Oct. 6 announcement of a 3.6 GW power deal with Constellation Energy that includes a 20 year nuclear PPA for 890 MW of upgraded capacity, cited by supporters as proof the industry can bring its own clean power. On the opposition side, a Memphis council vote on a data center moratorium ended in a brawl and was postponed, Evansville Indiana approved a 180 day pause, and Virginia regulators issued a notice of violation to Google for sediment runoff at a Chesterfield construction site, while a national labor and tech coalition launched a counter campaign in Indiana. Mixed results elsewhere: Lee County North Carolina commissioners rejected a broader moratorium, Oklahoma's Piedmont planning commission moved a large rezoning forward over opposition, and the Texas PUC sued the state attorney general to keep data center locations from being released under open records law.
  • October 6, 2026 Daily update: 7 news items, 1 reports, 0 new and 1 updated map projects, 0 number updates, 3 argument notes, 2 FAQ additions. The Oct 2-5 window brought one notable pro-industry data point and several measures tightening or questioning the deal. Oracle agreed to subscribe to 125-250 MW of Wisconsin nuclear power that Oracle says will absorb $300 million in costs otherwise borne by We Energies customers, Alabama's new law requiring data centers 150 MW and up to cover all incremental utility costs took effect, and Goldman Sachs reaffirmed its US capacity forecast despite the backlash. On the other side, Minnesota's attorney general told state regulators that an undisclosed Xcel-Google deal in Pine Island could expose other customers to roughly $1 billion in costs, Beaufort County, North Carolina adopted a one-year moratorium even with no project pending, and the village of Mahomet, Illinois ended talks with a developer after public pushback.
  • October 5, 2026 Daily update: 7 news items, 1 reports, 2 new and 0 updated map projects, 0 number updates, 3 argument notes, 0 FAQ additions. Over the last 48 hours the two sides of the data center debate both got new evidence. Opponents got the Minnesota attorney general filing with state regulators arguing that Google's Pine Island deal with Xcel could shift billions to other customers, the Cheyenne and Arapaho tribes voting a three-year moratorium on tribal land, a Vermont poll showing roughly two-thirds support for a statewide ban, and more Wall Street skepticism about data center IPOs. Supporters pointed to Crusoe filing a $4.8 billion two-building campus in Jayton, Texas, a scheduled Lexington, Kentucky council hearing on new zoning rules, and continued build announcements that keep investment moving.
  • October 4, 2026 New tracked number: US data center construction spending, year to date through August 2026 = $98.5 billion.
  • October 4, 2026 Daily update: 14 news items, 1 reports, 1 new and 1 updated map projects, 1 number updates, 3 argument notes, 0 FAQ additions. Industry made its most visible concessions in months, with Amazon pledging more than $1 billion over five years in data center communities and dropping NDAs with government agencies, while Oracle filed to subscribe to 125 to 250 MW of Wisconsin nuclear output for its Port Washington campus and a new Texas industry coalition launched to counter opposition. On the restriction side, Pennsylvania regulators advanced a tentative order putting new data centers first in line for grid curtailments, Pennsylvania House committees advanced three bills targeting NDAs and cost allocation, New Jersey fined a Vineland data center more than $1 million for running 62 unpermitted gas generators for nearly a year, and Vilas County, Wisconsin, moved toward a 12 month moratorium.
  • October 3, 2026 Daily update: 10 news items, 1 reports, 3 new and 0 updated map projects, 0 number updates, 3 argument notes, 0 FAQ additions. The Michigan Public Service Commission approved 20-year DTE contracts for Google's 1 GW Van Buren Township project with ratepayer protections, and Amazon dropped data center NDAs while pledging $1 billion for host communities. Oracle filed to subscribe to Point Beach nuclear output in Wisconsin, Pennsylvania House committee advanced three data center cost bills, and Casa Grande, Arizona approved a 954-acre campus 6-1. On the opposition side, a Vermont Public poll found 64% support a statewide ban, Mesa County, Colorado adopted a moratorium, and Rep. Jamie Raskin opened a House Judiciary probe of NDAs used by Amazon, Google, Meta and Oracle.
  • October 2, 2026 Daily update: 12 news items, 0 reports, 4 new and 0 updated map projects, 0 number updates, 2 argument notes, 0 FAQ additions. The U.S. Senate failed to advance the House-passed Ratepayer Protection Act in a 57 to 43 vote on September 30, with Democrats arguing the bill left ratepayer protections voluntary and some Republicans holding out for a tougher measure. At the local level the past 48 hours leaned toward restrictions, with Forsyth County, North Carolina rejecting a moratorium over legal risk while Mercer County, Kentucky killed proposed data center zoning near a coal plant and Charlotte scheduled a hearing to extend its pause through 2027, but Kline Township, Pennsylvania unanimously approved an Amazon campus and Cheyenne, Wyoming advanced two large campuses toward final approval despite planning commission opposition.
  • October 1, 2026 Daily update: 14 news items, 0 reports, 6 new and 0 updated map projects, 0 number updates, 3 argument notes, 0 FAQ additions. Federal regulators forced PJM to pull its September 30 backstop capacity auction and Senate Democrats blocked the House-passed Ratepayer Protection Act, leaving unresolved how data center costs will be allocated. On the project side Amazon signed a 20 year nuclear deal for 690 MW at Calvert Cliffs enabling about $3 billion of Maryland investment, Mississippi's Jefferson Davis County announced a $6 billion Big Woods Technology Park, and a Utah startup proposed a 9,500 acre nuclear powered data center on federal land, while local moratoria, bans, and ordinances advanced in California, Georgia, Michigan, Ohio, Kentucky, Wisconsin, South Carolina, and New York.
  • September 30, 2026 Daily update: 15 news items, 0 reports, 1 new and 0 updated map projects, 0 number updates, 4 argument notes, 0 FAQ additions. The past 48 hours brought a wave of local action tightening data center rules: Milwaukee's plan commission advanced a one-year moratorium, Saginaw's council adopted setbacks and a 55-decibel noise cap, St. Louis published penalties for a Midtown developer that misses tax and jobs targets, Buffalo's council advanced a two-year pause, and an Osage Nation lawmaker filed a bill giving tribal Congress a veto over hyperscale sites tied to a Google project. Push-back came from industry and labor: Blackstone, OpenAI, QTS, SoftBank and five building-trades unions launched the American Infrastructure Alliance to head off state moratoriums in seven states, and Google's data center chief used a Fortune piece to frame the buildout as a skilled-trades pipeline. Louisiana's governor defended his state's buildout by comparing data center water use to golf-course irrigation, while Illinois's governor kept pressing lawmakers to pass the POWER Act in the fall veto session.
  • September 29, 2026 Daily update: 12 news items, 1 reports, 2 new and 0 updated map projects, 0 number updates, 3 argument notes, 0 FAQ additions. In the last 48 hours, tribal, county and federal officials pushed for tighter data-center oversight: the Osage Nation Congress introduced a bill requiring legislative approval before hyperscale projects on tribal land, Sioux County, Iowa set a public hearing on strict new siting rules, and Tulare County, California adopted a formal position opposing most data-center development. A Washington Post satellite-image analysis found only about 40 percent of large data centers sit on previously developed land while a third sit on former farmland, and a New York congressman asked the state to disclose the value of discounted hydropower going to Rockland County data centers. On the industry side, the Georgia Chamber's Digital Infrastructure Alliance launched a six-figure statewide advertising campaign promoting the sector's benefits, and a Sept. 24 U.S. Department of Energy award directed 1.9 billion dollars to grid projects intended to speed data-center connections.
  • September 28, 2026 Daily update: 9 news items, 1 reports, 2 new and 0 updated map projects, 0 number updates, 3 argument notes, 0 FAQ additions. Applied Digital confirmed a $3.2 billion Alabama AI campus on September 25, with Meta suspected as the long term tenant, while Pennsylvania's East Whiteland Township adopted a new data center ordinance the same night and Kentucky residents filed ethics complaints against Carroll County officials with utility ties. A new Pew Research survey released September 22 finds Americans have turned sharply more negative on data centers since January, and Michigan's Brighton Township joined a growing list of local moratoria.
  • September 27, 2026 Daily update: 7 news items, 0 reports, 2 new and 0 updated map projects, 0 number updates, 2 argument notes, 0 FAQ additions. Governor Wes Moore signed a Maryland executive order codifying a uniform review for data centers 25 MW or larger and called on the General Assembly to repeal the 2020 data center sales tax exemption. Scott County, Kentucky extended its data center moratorium to March 2027 while a Palmerton, Pennsylvania borough took formal steps against a 700-acre, 13-building proposal in neighboring Lower Towamensing Township. New reporting quantified how much power Missouri's planned data centers would add relative to today, syndicated new national polling on data center opposition, and profiled the construction jobs boom colliding with local pushback.
  • September 25, 2026 Daily update: 11 news items, 0 reports, 4 new and 1 updated map projects, 0 number updates, 4 argument notes, 0 FAQ additions. The last 48 hours were dominated by two large stories: Oracle sent a force majeure notice to Blue Owl over Project Jupiter, the 2.45 GW New Mexico Stargate site, citing gas pipeline delays and permit setbacks, and Texas Attorney General Ken Paxton opened an investigation into hundreds of Texas data centers over unfiled water use reports. Local restrictions kept spreading (Pima County AZ, Marshall County IA, Woodbury MN, Warren County OH, Tulare County CA extension, Pulaski County AR heavy industrial reclassification), while Georgia Power filed with the state PSC a first of its kind subscription tariff that would have Google pay for 96 MW of nuclear uprates at Vogtle and Hatch.
  • September 24, 2026 Daily update: 16 news items, 1 reports, 7 new and 0 updated map projects, 0 number updates, 3 argument notes, 0 FAQ additions. Local and state pushback deepened, with Prince William County unanimously ending by-right data center development, Kershaw County SC passing a one-year moratorium, Baltimore County extending its pause through 2027, and North Port FL and Oakland CA advancing their own moratoriums. New Jersey issued a record 1.07 million dollar air pollution fine against the Vineland Data One project, while Oregon regulators finalized a Pacific Power rate structure that shifts new data center energy costs onto operators. Industry advocates point to the Texas PUC adopting softer than proposed interconnection rules and Virginia proposing brownfield sites for data centers, arguing the buildout continues under new guardrails rather than a halt.
  • September 23, 2026 Daily update: 18 news items, 1 reports, 7 new and 0 updated map projects, 0 number updates, 4 argument notes, 0 FAQ additions. Two major state-level actions moved data center policy in opposite directions from the same debate. California Governor Newsom signed seven bills adding new cost, disclosure, and water-review requirements on data centers, and Texas Governor Abbott expanded his moratorium to cover all environmental permits at TCEQ pending audits by ERCOT and the Water Development Board. Local pushback continued with new moratoriums or bans in Ohio, Michigan, Minnesota, Oregon, and Florida, while a Roanoke County, Virginia site was publicly confirmed as a potential data center campus.
  • September 22, 2026 Daily update: 15 news items, 1 reports, 7 new and 1 updated map projects, 0 number updates, 3 argument notes, 0 FAQ additions. Texas Governor Abbott expanded his data center moratorium on September 21 by ordering the state environmental agency to halt all data center permits, marking the fourth executive action in four months. Local pushback consolidated further with Baltimore County set to extend its moratorium through 2027, Prince William County (VA) voting September 22 on ending by-right approval, and new moratoriums moving in Miamisburg (OH), Raritan Township (NJ), Lycoming County (PA) and Fort Wayne (IN). On the industry side, Aligned Data Centers broke ground on a 2 GW campus at a former Pennsylvania coal plant, and North Carolina's attorney general asked regulators to create a separate Duke Energy rate class for data centers.
  • September 21, 2026 New tracked number: US data center projects blocked or delayed in Q2 2026 = 45 projects, about $68 billion.
  • September 21, 2026 Daily update: 10 news items, 4 reports, 1 new and 0 updated map projects, 1 number updates, 2 argument notes, 0 FAQ additions. In the past 48 hours the loudest new evidence is a Data Center Watch tally released September 21 finding 45 US projects worth about $68 billion were blocked or delayed between April and June, alongside an NPR report on how the backlash is reshaping local politics. On September 20, CBS 60 Minutes aired a segment on data center pushback in rural Texas, and on September 19 the Ohio Supreme Court ruling barring a Wilmington data center ballot measure drew wider coverage. Industry voices continue to argue new capacity is needed for the AI race and grid buildout, while opponents cite rate impacts, NDAs and local disruption.
  • September 20, 2026 Daily update: 9 news items, 1 reports, 2 new and 0 updated map projects, 0 number updates, 3 argument notes, 0 FAQ additions. Governors and courts moved on data centers this week. Nevada Governor Joe Lombardo signed an executive order curtailing state tax abatements and adding water, power and community requirements. The Ohio Supreme Court blocked a Wilmington citizens' initiative that would have let residents sue data centers, and a September poll found 78 percent of Ohioans back moratoriums as townships pass their 125th pause. Missouri, Indiana and Louisiana communities pressed transparency and water arguments, while the St. Louis Armory developer sued the city over new renewable and community benefit conditions.
  • September 19, 2026 Daily update: 10 news items, 1 reports, 2 new and 0 updated map projects, 0 number updates, 5 argument notes, 0 FAQ additions. Virginia Governor Abigail Spanberger signed an executive order on September 18 banning nondisclosure agreements and by-right approvals for data centers using more than 25 megawatts, while a bipartisan federal bill to make data centers pay for grid upgrades was blocked in the Senate on September 17. A state-commissioned Pennsylvania study warned data center demand could put the PJM grid below reliability standards from 2027 through 2030, and Colorado Springs postponed a decision on the contested Raeden Project Taurus data center after a heated hearing.
  • September 18, 2026 Number updated: 2026 year to date: the closest measured number is now 3.3% (was +3.3% commercial electricity sales). Source: EIA September 2026 Short-Term Energy Outlook.
  • September 18, 2026 Daily update: 11 news items, 2 reports, 3 new and 0 updated map projects, 1 number updates, 4 argument notes, 1 FAQ additions. The House passed the bipartisan Ratepayer Protection Act 417-3 on Sept 16, telling states to consider making data centers over 100 MW pay the full incremental cost of grid upgrades they trigger, and Loudoun County's Board of Supervisors advanced a 12-month pause on new data center and substation applications the same day. On Sept 17 Nvidia, Google and Emerald AI launched the AI Energy Management Alliance to promote grid-flexible data centers, while class-action plaintiffs sued xAI in Memphis over noise from about 60 gas turbines. Industry side highlights Meta's $3 billion Eagle Mountain expansion in Utah, a new Microsoft filing in Prince William County, and Moody's estimate that 45 GW of new generation costing about $110 billion is needed by 2030.
  • September 17, 2026 Daily update: 16 news items, 3 reports, 7 new and 1 updated map projects, 0 number updates, 4 argument notes, 0 FAQ additions. Loudoun County's Board of Supervisors voted 6-1-1 on September 16 to advance a one-year pause on new data center and substation applications, and Virginia's DEQ finalized a $2.5 million penalty against Microsoft over emissions from its Leesburg site, the state's largest data center fine to date. On the same day the Pennsylvania PUC released a Synapse Energy Economics study warning that under a high data-center growth scenario the PJM grid could see more than 13 loss-of-load hours per year by 2030, while Virginia's federal delegation introduced siting, transparency and cost-allocation bills. On the industry side, Woodburn, Oregon passed a 120-day municipal moratorium and Ohio's two leading gubernatorial candidates both said they will regulate data centers even as their financial disclosures show holdings tied to the sector.
  • September 16, 2026 Both sides: added Point 7 on noise, scale and rural character to the case against and the case for, with nine new numbered sources (32 to 39). Two new FAQ entries on noise and appearance. New tracked topic: Noise, appearance and rural character.
  • September 16, 2026 Data page: added 2025 and 2026 electricity figures. Berkeley Lab's 2025 estimate (about 234 TWh) and 2026 forecast (about 302 TWh), the Energy Institute's 2025 figure (312.6 TWh, a different series), the IEA's 2025 world total (485 TWh), and EIA's measured 2026 year-to-date commercial sales (+3.3% through June) as the closest real proxy. Three new entries in the report center.
  • September 16, 2026 Daily update: 10 news items, 0 reports, 5 new and 0 updated map projects, 0 number updates, 0 FAQ additions. In the last 48 hours, five US municipalities (Lima OH, Pioneer OH, San Francisco, Hayward CA, and Loudoun County VA) advanced or introduced data center pauses or bans, while Virginia's DEQ ordered Microsoft to pay roughly $2.5 million for generator air pollution at a Leesburg site. Texas Gov. Greg Abbott directed the state water board to penalize data centers that fail to report water use, and Microsoft, in a separate industry update, said it plans to more than triple its global fleet to over 38 gigawatts by 2032.